White Paper | March 2, 2012

Four Steps To Determine When A Standby Generator Is Needed For Small Data Centers

Source: APC by Schneider Electric

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours.

For full access to this content, please Register or Sign In.

Access Content Four Steps To Determine When A Standby Generator Is Needed For Small Data Centers
Newsletter Signup
Newsletter Signup
Get the latest channel trends, news, and insights
By clicking Sign Me Up, you agree to our Terms and that you have read our Privacy Policy.